Public tender offshore wind PPA
Je hebt nog 65 dagen om deel te nemen.
Je hebt nog 65 dagen om deel te nemen.
Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this - Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years. The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization: 1. Mutual option for EemsEnergyTerminal when FID is taken - 10 MW from 1-1-2029/30 till 2036 with the possibility to be extended till the end of the contract term. 2. Mutual option to facilitate minor portfolio increases: maximum of 10 MW to be mutually agreed upon during the contract term with a duration of at least one year...
Van ruwe aanbestedingsdata naar inzichten waar je direct op kunt sturen. TenderGuide maakt zichtbaar wat er speelt, wat er komt en waar jouw kansen liggen.
Zie waar de meeste aanbestedingen zijn en waar groei zit.
Weet wanneer contracten aflopen en waar nieuwe kansen ontstaan.
Zie wie wint in jouw markt en waar jouw grootste kansen liggen.
Met slimme zoekfuncties
Voor jouw sector en regio
Data-gedreven inzichten