Benthic Survey of the Doordewind Wind Farm Zone
Je hebt nog 53 dagen om deel te nemen.
Je hebt nog 53 dagen om deel te nemen.
The objective of this assignment is defined in the Starting Points and Assumptions - and in the Scope of Work. The overall objective of the benthic survey is to collect factual benthic data to validate the findings of a desktop study on reef detection in the DDW WFZ (results available at offshorewind.rvo.nl) - and to establish a baseline measurement of the benthic environment in the area. The objective of this procurement is to contract a qualified contractor to perform a benthic offshore survey and associated laboratory analyses - resulting in reliable baseline ecological data for the Doordewind Wind Farm Zone. The results will enable the Contracting Authority to provide high-quality site information for the preparation of future offshore wind permitting procedures and support...
Van ruwe aanbestedingsdata naar inzichten waar je direct op kunt sturen. TenderGuide maakt zichtbaar wat er speelt, wat er komt en waar jouw kansen liggen.
Zie waar de meeste aanbestedingen zijn en waar groei zit.
Weet wanneer contracten aflopen en waar nieuwe kansen ontstaan.
Zie wie wint in jouw markt en waar jouw grootste kansen liggen.
Blijf op de hoogte en maak sneller de juiste keuzes.
Met slimme zoekfuncties
Voor jouw sector en regio
Data-gedreven inzichten